Following the victory over France in the war of 1870–71, military experts pushed for the construction of a continuous railroad line from Berlin to Metz in Lorraine. By that time, nearly all major trunk lines in Germany had been completed, so that by linking existing sections with new ones to be built, an efficient and direct supply route to the newly acquired territories could be created.
The route and operational management were primarily designed to meet military requirements and ran from Berlin via Wiesenburg, Calbe, Güsten, Sangerhausen, Nordhausen, Leinefelde, Eschwege, Malsfeld, Treysa, Marburg, Lollar, Wetzlar (bypassing Giessen), Koblenz-Trier, Diedenhofen (Thionville) to Metz. Given the limited capacity of the locomotives, the transport of heavy freight trains carrying military equipment and troops—particularly through low mountain ranges—required many expensive engineering structures to construct the line with gentle gradients and generous curve radii. Furthermore, the new sections of track to be built were often located in very sparsely populated areas, which did not allow for economically viable traffic in peacetime. With a total length of approximately 805 km, the financing for the expansion of existing lines and the construction of about 511 km of new track was secured by the so-called “Kanonenbahn Act” of June 11, 1873, which provided for bonds in addition to funds from French reparations payments. After the Kanonenbahn was completed in 1880, through-traffic never gained significant importance, so that the originally planned double-track expansion was abandoned in some sections.

Beginning in 1878, as political relations with Russia deteriorated following the Balkan Conference, Germany found itself threatened by France to the west and Russia to the east, and prepared for a war on two fronts in which the railroad was to play a decisive role. Initially, according to the offensive plan drawn up by Colonel General von Schlieffen in 1905, troops were to be transported to the Western Front in the event of war in order to quickly defeat France. Subsequently, the same troops were to be immediately transferred to the Eastern Front. In addition to the important east-west connection provided by the Kanonenbahn, other strategic rail lines—particularly in the western part of the German Empire—were crucial to the military for waging a swift and victorious war against France. In southern Germany, in particular, there was no suitable supply route from Bavaria and Württemberg to the annexed Alsace, since the Upper Rhine route from Singen via Schaffhausen to Basel repeatedly crossed Swiss territory and, due to the underlying international treaties, could not be used for military purposes. By 1890, therefore, the Danube Valley Railway—which ran from Ulm to Sigmaringen—had been extended via Immendingen to Waldshut to connect the federal fortress of Ulm with the fortress of Belfort. In addition, two newly constructed lines ran between Bad Säckingen and Schopfheim, as well as between Lörrach and Weil, passing through Swiss territory in the Basel area. In Weil, a railway bridge—designed as a double-track structure but put into service as a single-track line—had provided a connection since 1878 to the Imperial Railways in Alsace-Lorraine, leading to St. Ludwig (St. Louis). Starting in 1895, the Graben–Neudorf–Karlsruhe–Rastatt line provided additional track capacity in the Rhine Valley and, via the Rhine Bridge near Wintersdorf, established a connection from Rastatt to Roeschwoog, continuing on to Haguenau, where there were connections to Strasbourg and Saargemünd. To improve traffic from the Rhine-Main region to Lorraine, the Worms–Monsheim–Langmeil to Kaiserslautern line was completed as a double-track line in 1873 as another strategic railway. To expand the capacity of the Koblenz –Trier section of the Kanonenbahn and to bypass the 4,203-meter-long Kaiser Wilhelm Tunnel in Cochem, construction began in 1916 on the right-bank Moselle Railway between Treis and Neef; despite the completion of further sections of the embankment and a 2,650-meter-long tunnel, the line remained unfinished. The same fate befell the Trier–Ehrang bypass, construction of which began in 1917.

An entire network of strategic rail lines sprang up in the Eifel. The Ahr Valley Railway, which had been running from Remagen to Adenau since 1888, received a station in Dümpelfeld—just before the Adenau terminus—in 1912, along with a connecting line and a track triangle to branch off via Ahrdorf and Hillesheim into lines leading to Lissendorf and Jünkerath and Gerolstein, respectively, both of which lie on the route from Cologne to Trier. At the same time, the strategic east-west connection was fully upgraded to double track and was equipped with a major depot featuring a turntable in Kreuzberg. A single-track connecting line also ran from Ahrdorf to Blankenheim. As a northern access route bypassing Düsseldorf and Cologne, construction began in 1904 on the strategic Neuss–Rommeskirchen–Horrem–Liblar–Rheinbach railway embankment to Dernau in the Ahr Valley, which was never fully completed. As a western extension of the Ahr Valley Railway toward Belgium, the Vennquerbahn was built in 1912 from Jünkerath via Weywertz to Malmedy; during World War I, it was expanded into a double-track main line.
All images: Hans Kobschätzky Collection.