Milestones in Technology – Inclined Planes

blog Schiefe Ebene

In addition to crossing rivers, valleys, and mountain ridges, Germany’s often hilly topography posed enormous challenges for engineers building early railroads. On steep gradients, the advantage of low friction—or adhesion—between the rails and wheels, which enables the transport of heavy loads, becomes a disadvantage. Due to the low friction between the rails and wheels, steep gradients cannot be negotiated, depending on the train load, the tractive force, and the weight of the locomotive. For this reason, the primary focus in route planning was always on achieving a sufficiently level route. Nevertheless, it was not always possible to avoid gradients.

In the absence of economically viable alternatives, the first steep-gradient line in Germany—a one-way operation between Vienenburg and Bad Harzburg—began operating in 1840, with horses pulling the trains uphill while the cars rolled downhill on their own. However, two years after this section was connected to the network of the Braunschweig Railway Company, locomotive-powered operations began here as well on November 8, 1844. Due to technological advances, the system of inclined planes—which was widespread in Great Britain—did not catch on in Germany. In Germany, stationary steam engines pulling the cars uphill via a cable system were used only on the steep gradients of Erkrath–Hochdahl and Aachen–Ronheid. On the steep Erkrath–Hochdahl section, this procedure proved uneconomical as early as the year of its opening. After the facility was redesigned, a train traveling downhill would simultaneously pull an oncoming train traveling uphill up the ramp via a cable system using three pulleys. This method also proved effective with individual locomotives used for the downhill haul, making operation with the stationary steam engine unnecessary. Beginning in 1926, the uphill section of this steep ramp was also tackled using leading and pushing locomotives—as was customary elsewhere in Germany. On the Ronheider Ramp, the 200 PS stationary steam engine proved its worth for twelve years before major repairs became necessary. Since the steam locomotives used on an interim basis performed well, the stationary steam engine was phased out starting in 1854. The conventional use of a pulling locomotive and two pushing locomotives made operations about 50% cheaper, especially since the continuous cable had to be replaced every two and a half years due to heavy wear and tear.

Even for the so-called “Schiefe Eebene” between Neuenmarkt-Wirsberg and Marktschorgast, the plans of the Royal Bavarian State Railroad originally called for the construction of a stationary steam engine. Instead, however, a ramp with a uniform gradient—which was extremely complex to build—was constructed, allowing heavy trains with leading and pushing locomotives to travel without having to split the train. The Royal Württemberg State Railways applied the same principle to traverse the Swabian Alb via the Geislinger Steige between Geislingen and Amstetten, as did Bavaria with the Spessart Ramp between Laufach and Heigenbrücken and Saxony between Tharandt and Freiberg. Since ramp operations proved to be labor-intensive and correspondingly expensive, the goal was to keep the ramp sections as short as possible.
The limited capacity of the ramp sections was addressed through double-track construction, telegraphy, and block sections. Special operating regulations governed all specific requirements, particularly those related to the critical issue of braking. Steam locomotives had to travel uphill with the chimney facing forward so that the firebox was sufficiently flushed with water, and when operating with only one locomotive, it was always to be positioned on the valley side to prevent any cars from breaking away from the train. It was during the construction of the Black Forest Railway from Offenburg to Singen that the route was artificially extended for the first time with loops and reverse-direction tunnels in order to avoid the need for ramp operation. Robert Gerwig (1820–1885) created Germany’s first mountain railway with the Black Forest Railway and went on to complete his masterpiece as a civil engineer in 1882 with the subsequent construction of the northern ramp of the Gotthard Railway.

Notable steep gradients in the early days of rail travel in Germany:

SectionLineSlopeLength in km
Vienenburg-Bad HarzburgBraunschweig-Bad Harzburg1:478,31840Originally a horse-powered operation
Erkrath-HochdahlDüsseldorf-Wuppertal1:302,51841Cable-driven operation with a stationary steam engine
Aachen-RonheideAachen-Lüttich1:382,01843-54Cable-driven operation with a stationary steam engine
Neuenmarkt-Wirsberg – MarktschorgastBamberg-Hof1:43,56,8since 1848Adhesion Mode
Geislingen-AmstettenStuttgart-Ulm1:44,55,6since 1850Adhesion Mode
Laufach-HeigenbrückenFrankfurt-Würzburg1:505,4since 1854Adhesion Mode
Tharandt-Freiberg/SachsenDresden-Chemnitz1:3926,3since 1862Adhesion Mode
Hausach-St.GeorgenOffenburg-Singen1:5038,1since 1873Adhesion Mode